Wind and Rain Bridge Completely Constructed without Mechanization
Bridge construction in the area of of Peitian Village, Fujian Province, China is build completely without the use of mechanical fasteners. Wind and Rain Bridge connects people with the rest of the world by this interesting interlocking timber structure. The construction was under the supervision of traditional carpenters. They give their “blessing” for each element installed in the construction. There were 265 elements completely unique and integral, assembled who number some of the few remaining exponents of their craft. See the images showing the project design and the way it all was connected as a complete construction.
Source.
The post Wind and Rain Bridge Completely Constructed without Mechanization appeared first on Architecture Admirers.
...
Source:
architectureadmirers
URL:
http://www.architectureadmirers.com/
-------------------------------- |
SUPERFICIE CÓNICA |
|
Tao Zhu Yin Yuan: Carbon Absorbing Vertical Forest
05-05-2024 08:27 - (
architecture )
Music Room Ideas Perfect for Transforming Your Spare Space Into a Creative Haven
05-05-2024 08:24 - (
architecture )