How is Done the Express Pool Construction in Kombank Arena

In the same place where the Kombank Arena is happen a huge change with the terrain. For the needs of the organization FINA European Water Polo Championships 2016, there was installed a temporary and removable stainless steel pool. These are two swimming pools made of stainless steel system called Myrtha Pools which is produced and edited by the Italian company Piscine Castiglione. One of the pools is used for the competition while the other is used for heating needs and training. See the video and fast forward construction process.
Source here.
...
Source:
architectureadmirers
URL:
http://www.architectureadmirers.com/
-------------------------------- |
Live interview with Aric Chen as part of Dezeen 15 | Dezeen |
|